Structural
Recent Featured Projects

Pete's Kitchen Channel Improvements- Lac La Hache, BC
- Huxham Contracting Ltd.// Ministry Of Transportation
Summer- Winter 2025
Blackbird Industrial Ltd. was tasked with providing supervision, quality management, as well as key labor and equipment throughout the duration of the project. The project scope included : retaining wall removal, channel excavation, cellular concrete infill, conflicting utility removal/ re-installation, 100+/-m of epoxy coated sheet piling, as well as concrete coping construction, fence installation, and in-stream habitat restoration.

Gowen Creek Bridge - North Bend, BC-
Cancon Construction //Ministry Of Transportation
Winter 2024
Blackbird Industrial was responsible for the supervision, key manpower/ equipment and execution of the cast-in-place substructure on this challenging project as well as providing access and support for rock/ soil anchor installation activities.

Cervus Creek Bridge Replacement- Gold River, BC-
Enviro-Ex Contracting// Ministry Of Transportation
Fall 2023- Summer 2024
Blackbird Industrial was responsible for much of the planning, supervision, and execution of this highly successful bridge replacement project on Highway 29. Project scope included construction and eventual removal of 30m detour road/ bridge as well as demolition and safe removal/ disposal of the 40m existing creosote timber bridge structure. New bridge construction consisted of piling, cast in place "integral" abutment structures, steel girder superstructure, as well as a full depth cast-in-place concrete deck/ approach slabs.

Tamen Creek Culvert Replacement- Rose Lake, BC-
Enviro- Ex Contracting// Ministry Of Transportation
Summer 2023
Blackbird Industrial was able to provide key planning, supervision, and tools to fabricate and install a new 40m+ long 5.5mm dia. multiplate culvert complete with cast in place head wall structures. Multiplate structure construction consisted of over 180 individual pieces, 5400+ bolts and a rigid installation/ quality control process.

Keystone Bridge Replacement- Mission, BC
- AXCO Construction
Winter/ Spring 2022
Blackbird Industrial Ltd. provided engineering, design, quality assurance, and overall project management services on a 10+/-m span bridge.

Kaslo River Bridge Replacement- Kaslo, BC
- Hall Constructors Ltd.// Ministry Of Transportation
Spring- Winter 2021
Blackbird Industrial Ltd. was tasked with providing supervision and various demolition/installation services on several aspects of this project. Activities included: Temporary detour 40m steel girder bridge erection and installation across Kalso river, existing creosote timber bridge removal, demolition, and disposal, excavation, underground utility ( water, sanitary, storm) installation, road grading, paving support, pile driving support, concrete forming, and new bridge erection/ construction.