top of page

Marine

Recent Featured Projects

IMG_7188(1).jpg

Comox Wharf and Pier Reconstruction Project, Comox BC
Small Craft Harbors// Department of Fisheries and Oceans

Spring- Summer 2025

 Blackbird Industrial Ltd. was the general contractor and responsible for all aspects of marine construction/ de-construction activities.    The project scope included "bobber log" removal/ replacement, various diver assisted  float repairs, structural repairs to the piles, piers, gangways, and floats, as well as construction of an entirely new breakwater platform.  All works were undertaken while the marina was fully operational and completed with very limited interruptions.  

DSC_0289_edited.jpg

Powell River Marine Outfall- Powell River, BC-
JJM Construction Ltd. // City Of Powell River

Spring/ Summer 2022

Blackbird Industrial Ltd. had the opportunity to provide supervision, key manpower, and support equipment to fabricate and install an 800m long 900mm diameter marine outfall in Powell River, British Columbia as part of a larger wastewater treatment facility upgrade.  This challenging project highlighted Blackbird's commitment to the highest safety, environmental, and quality standards.

bottom of page